September 2011

2011 { 09 10 11 12 } - top

Unloading supplies for month

 

Unloading wood and plaster boards

 

Beds bought

Old chairs restored and repainted

 

Water meter goes in

 

Fish chips night

Boats passing our garden

 

First fix lounge starts

 

Jacque painting

One weeks rest - Spain

 

One week repairing ceiling

 

Neigbour giving John advice

Neighbor's house warming

 

Moissac poster

 

Apple tree grow in our street

Rue de arts

 

Vintage cars in our road

 

Lunch outside our front door

Music

 

Our house

 

Old lamp to restore

Old sink out re-wiring

 

Art work for house

 

Finished my landing painting

Lounge far wall boarded

 

Smashing time

 

Old doors out

Testing new doors

 

New patio doors

 

First coat in lounge

Dance while you paint lounge

 

Our diet bread

   

October 2011

2011 { 09 10 11 12 } - top

Eclectic and plumbing goes in

 

Our electric angel Mick lends a hand

 

Drainage from kitchen

Friends sons arrive to help

 

Boys making plans

 

Brothers work together

Kitchen electric sockets go in

 

Porch takes shape

 

Adam working hard

Poor Andrew taken ill

 

New wall's in kitchen

 

Porch work continues

Plumbing work continues

 

Decision time

 

Tile Delivery

Kitchen and Lounge tiles to door

 

Make shift kitchen

 

Irene cooks many meals
make shift kitchen

Pebbles delivered into back garden

 

Work commences in the back garden

 

Kitchen now ready for tiling

Kitchen tiles are down

 

Lounge floor prepared

 

Back wall prepared for
next stage of painting

Fridge arrives

 

Yes one more day nearer to
fire lighting day

 

Earl and Fiona our fire angels

Entrance and tiling

 

Fire place, work commences

 

Help arrives end of month

   

Mike and Jane lend a hand

   

November 2011

2011 { 09 10 11 12 } - top

Bedroom windows taken out

 

Big open space in bedroom

 

Bricks and sand delivered for new wall's

John checking out drainage

 

John installs patio drainage

 

Digging trench

John builds new drains in garden

 

Neighbor and family lend hand on our patio

 

First layer of ground work

John helps our neighbor

 

Adam roofer today

 

Adam has design head on

Adam works like a dream

 

Basement floor tiled

 

Beer and fire wow

Dinners continues in loft

 

Friends call in to see progress

 

John heaven

John learns to use jig saw

 

Kitchen coming together

 

Kitchen cupboards go in

Lining chimney

 

Me cooking first breakfast in kitchen

 

Mike removing old varnish

Nov sunshine breaks in garden

 

Polly design art work for loft

 

Polly Eric's stay

Polly hangs her gift up

 

TV dish in the planning

 

View from our roof top

Wall units next

 

Work starts in basement

   

December 2011

2011 { 09 10 11 12 } - top

01 John continues work on patio

 

Alan, Mike, Jackie all help with concreting

 

John, Mike and Alan work hard

Neighbors help also

 

Our patio takes shape

 

Wood Delivery

New addition to tools

 

Final coat applied

 

 

My paintings are added

 

Landing final varnish

 

Staircase gets another coat of varnish

All ready for family arriving

 

Curtains are added

 

Finishing touches added

Loft bedroom bed made

 

Rugs are added

 

Bedroom 2 is completed

Furniture delivered in time

 

Kitchen lights all go in

 

Mistletoe goes up

Christmas decorations go up

 

Polly lends a hand

 

Family arrive in Moissac

A baby is due, best present ever

 

Xmas in our New Home

 

 

Family cook dinner

 

Yorkshire pods

 

Our kitchen becomes the dance floor

Opening Christmas presents

 

 

 

Boxing day